Birmingham New Street Station

  • Twitter
  • Facebook
  • LinkedIn
  • Google+
  • Email
Project PDF Query Form
Name *
Company
Email *
Query
Enter keyword specified in image
Captcha

In the early 1960s, Birmingham New Street Station was originally rebuilt to accommodate 60,000 passengers a day and the concrete station came to represent the city of Birmingham for many travellers. The redesign of Birmingham New Street has transformed the reinforced concrete station into a futuristic transport hub.

In 2008, Network Rail awarded Atkins the detailed design (GRIP 5) for Birmingham New Street, where up to 170,000 passengers now travel through the station each day.

Over seven years, Atkins played a lead role in the design of the station and the shopping centre Grand Central, overcoming significant challenges by applying innovative solutions to help successfully deliver one of the biggest station refurbishments in Europe.

The project involved the assessment of existing structures and the design of new ones including the stainless steel façade, new atrium roof and the steel framed John Lewis structure, which is built partly over the 1965 reinforced concrete station. This entailed the building of a Global Stability Analysis Model (GSAM), to understand how the old station and the new constructions would behave under different loadings, both in its final state and during key stages of the construction programme.

Working closely with Network Rail and Mace, Atkins drew upon their range of multidisciplinary specialists, from civils, highways and architecture, to modelling, telecoms, landscaping and project management to deliver the design for this extraordinary project.

The station was officially reopened on September 20, 2015.

 
Architecture hub
 
 

Key facts

Location:
Birmingham

Country/Region:
United Kingdom

Client:
Network Rail

Additional facts: Ÿ 
Improved passenger facilities and environment with a concourse 5 times larger than Euston and prime retail offering.  

Iconic gateway to the city of Birmingham with improved access to the station and links to the city.

Engagement with the client and contractors.

RELATED SECTORS

CONTACT

UK Europe

Stephen Ashton
Director, transportation
T: +44 121 483 5625
E: stephen.ashton@atkinsglobal.com

RELATED PROJECTS

  • The Thameslink Programme at Farringdon Station aims to create an environment that meets the present and future needs of rail operators, passengers, staff and the local community.

    Atkins was appointed as the detailed designer to help Network Rail accommodate longer trains and increase passenger throughput. We were also commissioned by London Underground, who owns the station, to provide concept and detailed design for the associated station entrances and integrated ticket hall, as well as the respective concourses and platforms.

    Architecture hub

    UK ,

  • A joint Atkins/Arup team undertook one of the largest and most important elements of the Crossrail project - the detailed design of the major twin tunnels to be bored beneath central London.

    The tunnels are 6.2m internal diameter, at depths of up to 37m. Eight TBMs were used to construct the tunnels - six Earth Pressure Balance Machines (EPB) and two Slurry Machines - to cater for differing ground conditions. The tunnels are lined with 250,000 Precast Concrete Segments. Tapered tunnel rings with 8 segments were designed to accommodate the minimum track alignment radius. The majority of the tunnel segments are steel fibre reinforced and include poly-propylene fibre for fire protection. Segment joints are designed with locating dowels to facilitate high quality build ensuring good waterproofing performance and long term durability. Curved geometry on the segment joints is included to improve performance and protect the segment. There are a total of 18 cross passages along the bored tunnels length, constructed in a variety of linings, including insitu concrete, pre cast SGI and sprayed concrete.

    Some of the most challenging conditions were faced on the central tunnels which pass beneath the two major financial districts, the City of London and Canary Wharf, where water bearing sand lenses were encountered. EPB TBMs were driven in parallel with station constructions which required TBM arrival, transit and re-launch systems to be developed.

    One of the biggest challenges of the tunnelling works under central London was protection of the vast network of existing third party utilities, tunnels, structures, railways and historical buildings. Atkins' engineers seconded into the Crossrail project have been responsible for the damage assessment and the design of mitigation to protect third party assets from settlement induced damage. The assessments were undertaken in accordance with a robust phased approach to ensure consistency with focus placed on the most sensitive structures.

    Timely resolution of concerns with stakeholders and third parties was key to securing “letters of no objection” to allow construction to progress. The extensive third party asset information assembled during the design phase was carefully managed and organised, allowing it to be integrated as a key data set into the Crossrail’s BIM system.

    Over 3,400 buildings, 640 structures (including London Underground tunnels and other rail assets) and up to 14,000 utilities (gas, sewer and water mains) have been assessed to date. As part of the project management team, our engineers continue to advise the client on all issues relating to third party asset protection, accounting for the actual works being undertaken and the ground response on site.

    Atkins was also awarded the architectural component contract for all the stations and associated structures. This award covers the design and specification of interior elements such as the wall and ceiling finishes, cladding systems, seating, lighting and wayfinding.

    Upon completion the line is expected to carry 72,000 passengers per hour through 40 stations travelling from Reading and Heathrow in the west, to Shenfield and Abbey Wood in the east.

    Architecture hub

    UK ,

  • Our work on the Doha Metro is helping Qatar improve transportation and infrastructure across the city. The programme is critical for the 2022 World Cup and is central in delivering Qatar’s 2030 vision.

    We were appointed as lead designer by the ALYSJ JV to deliver the Gold Line Metro stations comprising 13 underground stations and 16km of twin bore tunnels.

    Our role on the Gold Line includes architectural design, station planning, structural, design of twin bore tunnel, geotechnical analysis and site investigations, site monitoring of AGI Works, design of excavation support, fire and life safety strategy, alignment design, support of the client’s requirements, management and systems assurance and additional works for mechanical and electrical building services design.

    Once complete, the Doha Metro will reduce congestion and pollution while offering sustainable, attractive and fast public transportation choices for the first time.

    Qatar ,

  • The design provides a contemporary station which responds to both site and a sustainable agenda. The asymmetrical nature of the station can also be oriented to work with the solar path and therefore minimise solar gain.

    The form of the station has been specifically designed to allow passive smoke exhaust from the trains. This reduces both capital and operational costs but, most importantly, the stations impact on the environment.

    Kuwait ,