At Fort Lauderdale-Hollywood International Airport, which serves 23.5 million passengers annually, we focused on delivering results that would help accommodate existing flights more efficiently, prepare for future growth, and offer positive experiences for travelers.

By replacing a 5,300-foot general aviation runway with a new 8,000-foot commercial service runway, the airport has been able to increase its capacity and flexibility in handling larger commercial jets. The expansion of Runway 10R-28L was critical to the airport’s long-range development capacity goals and the overall U.S. air traffic system, increasing aircraft operations from 80 operations per hour to more than 100.

Atkins served as lead designer responsible for the replacement and expansion of Runway 10R-28L and associated taxiways, leading a team of 16 specialized and local subconsultants. As project manager/engineer-of-record for the $791 million expansion, Atkins developed the design criteria package for the elevated bridge-tunnel structure, using a design-build methodology. It’s only the second time a runway in the U.S. has been elevated for active roads and rail. The expanded south runway and parallel taxiway extend over the existing airport perimeter road, Florida East Coast Railway, and US Highway 1. Atkins also performed construction administration and oversight for the project, which is among the largest construction projects of its kind to be undertaken in the U.S.

Throughout the course of the project, an estimated 11,000 temporary construction jobs were created, with a $1.4 billion impact to the regional economy. The project was awarded Commercial Airport Project of the Year by the Southeast Chapter of the American Association of Airport Executives (AAAE).
































Key facts

Location:
Fort Lauderdale, Florida

Country/Region:
United States of America

Client:
Broward County Aviation Department

Collaborators:
Advance Consulting Engineering Services, Inc.
Aylward Engineering & Surveying, Inc.
Basulto Management Consulting, Inc.
Brindley, Pieters and Associates, Inc.
Cartaya and Associates Architects, P.A.
Construction Management Services, Inc.
Derose Design Consultants, Inc.
Heath and Lineback Engineers, Inc.
Hillers Electrical Engineering
Keith & Associates, Inc.
Miller Legg and Associates, Inc.
QED Engineering, Inc.
Reynolds, Smith & Hill, Inc.
Tierra South Florida, Inc.
Trans Solutions, Inc.
Weidlinger Associates, Inc.

RELATED SECTORS

RELATED SERVICES

CONTACT

RELATED PROJECTS

  • Atkins completed a 100% design for repair of Runway 05-23 at Fairchild Air Force Base, Washington. Our initial work included verifying all requirements and scope details through a field survey prior to design. We then conducted design analysis before preparing preliminary and final design drawings, specifications, construction phasing plans, cost estimates, and bid schedule information to develop a set of construction bid documents and drawings for a competitive construction solicitation with a traditional design-bid-build delivery method. A new medium-load pavement—13,899 feet in length with 25-foot-wide paved shoulders—was designed to replace the existing runway pavement. The load-bearing runway pavement was narrowed from 300 feet to 150 feet, and the design included all associated airfield edge, centerline, and approach lighting systems; lighting controls; lighting vault equipment; and building modifications. A new precision approach path indicator (PAPI) system is powered by new regulators located in the airfield lighting vault.

    Atkins also developed design and contract documents in accordance with Air Force requirements for airfield pavements and airfield lighting. Additional services included performing the required testing to identify and quantify all hazardous materials. We also evaluated alternate means of demolishing, replacing, and recycling existing pavements to provide cost analyses and recommendations with the 10 percent conceptual design submittal.

    USA ,

  • Hartsfield-Jackson Atlanta International Airport’s Runway 10-28, also known as the fifth runway, has been called the most important runway in America.

    Atkins provided site preparation, paving and lighting, and construction documentation to bring this new 9,000ft runway to reality, and to alleviate delays at the world’s busiest airport.

    This runway project required over 17.5 million cubic yards of embankment – transported from a local quarry via a five-mile conveyor system – and the crossing of 10 lanes of I-285, resulting in a runway over 60 feet higher than the interstate highway in some locations.

    USA ,

  • Atkins has been co-located within London City’s operational project team since 2000, providing engineering and project management expertise vital to the airport’s expansion. In recent years, we have undertaken a range of major projects including apron reconfiguration, stand reconfiguration for E190 and A318 aircrafts and masterplan validation and implementation.

    Our role also included the design of new and modified facilities, including new taxiways, and the design and delivery of three new stands. This work involved multidisciplinary engineering and architectural input into the relocation of an airport access road and new stands for the current aircraft fleet including pavement design, services relocation, drainage design, stand floodlighting and airfield markings.

    UK ,

  • Taiyuan Wusu airport is located to the southeast of Taiyuan which is the capital city of Shanxi Province and its political, economic and cultural centre. In ancient times, Taiyuan was an important military town but it is now one of China’s most important centres of heavy industry, using more than half the nation’s coal output.

    Fundamental to the planning for this new terminal was maintaining the efficient relationship between the terminal and the flight area. Also, the terminal zone had to satisfy the demands of both short term and long term operation.

    A building form angled at 45 degrees was used to develop the character of the site. By join­ing the new main building and its gate piers to the existing terminal, this makes it a visual as well as a functional part of the entire complex. The existing building and the new extension merge around three courtyards that are evocative of traditional Shanxi courtyards.

    The courtyards are open internal spaces bringing light and air into the centre of the plan where they can be appreciated by domestic and international passengers.

    China ,

  • We are working with the Airport Authority Hong Kong to implement a three-runway system (3RS), involving construction of a new airport platform north of the existing north runway. Our scope of works includes the design of the ground improvement works, reclamation, seawalls, re-provisioning works and the extension and modification of existing large box culverts. The size of the reclamation will be approximately 650 hectares - about half the current size of the airport platform.

    The main challenge of the project is that no dredging of the soft sediments is allowed because of environmental concerns. Our key task is to develop cost-effective methods to strengthen the soft sediments in-situ such that the post-construction settlements are limited to acceptable values. A follow-up field trial will be conducted to confirm the performance of the treated seabed using the Deep Cement Mixing (DCM) technique.

    The detailed design will be delivered within a tight schedule to facilitate the anticipated award of the main works contract in 2016. Our services will continue into the construction phase with the provision of design support services.

    Upon completion of the 3RS, the expansion plan will allow the airport to handle an additional 30 million passengers a year according to the Airport Master Planning of 2030.

    China ,